Workshop
EME - demonstration project in Q
Copyright © 2014-2017 Strategic Alliance | All rights
reserved
Events
EME demonstration project
in Queensland
DATE: Monday 24 March 2014
VENUE: Novotel Brisbane Airport
|
|
|
|
Austroads Technical Report AP-T249-13 “EME Technology Transfer to Australia: An Explorative Study”
|
|
|
|
AAPA 2012 Master Class - Premium Asphalt Bases
|
|
|
|
Event organisers
|
|
|
|
|
Background overview to EME
|
|
|
|
|
What makes the EME binder different
|
|
|
|
|
Getting the EME mix design to work
|
|
|
|
|
Delivering the job - production
|
|
|
|
|
Delivering the job - field operations
|
|
|
|
|
What we need to know and learn from the demonstration project
|
|
|
|
|
Why BCC was prepared to be part of the demonstration project
|
|
|
|
|
Feedback on the national Austroads project on EME
|
|
|
|
|
|
|
|
|
First EME in Australia being placed on 119 Cullen Avenue West, Whinstanes
|
The EME is currently uncovered and able to be viewed at the 119 Cullen Ave West site
|
The technology transfer of “Enrobés à Module Élevé” (EME) from France to
Australia has taken off. Local hard binder and aggregates have been sent
to France and mixes developed for two of AAPA’s members. The demonstration
placement of these mixes has happened in Queensland and soon in New South
Wales.
A feedback session by Boral, BCC, QTMR, ARRB and AAPA took place on 24
March at the Brisbane Airport Novotel providing details of the mix design
process local testing and learnings from EME placement.
Workshop purpose
Workshop program
Supported by
Photographs of the EME demonstration project HERE
EME 1st demonstration project in Queensland
Dr Laszlo Petho of ARRB sharing on what we need to learn from the EME demonstration
project in Q
AAPA AWARD presented to the partners in the
"First Australian EME demonstration project"
AAPA CEO Michael Caltabiano presented the awards to the partners in the
"First Australian EME demonstration project" at the EME workshop.
QTMR - Paul Smith ARRB - Carlos Rial Colas - Azeem Remtula
SAMI - Iulian Mann Speedie Contractors - Simon Knowles South East Profiling - Bob Swan
BCC - Joe Bannan Boral - Trevor Distin AAPA - Rob Vos
Chris Lange & Rob McGuire
Nigel Preston & Michael Caltabiano
Rod MacBeth & Cameron Nisbett
Workshop photographs
PSS107 May 2017 High Modulus Asphalt (EME2) Pilot specification updated May 2017
|