New Asphalt Harmonised
Awareness Sessions
Event organisers
Date
Centre
Address
Monday
25 August
Cairns
Dept of Transport & Main Roads
Room 6.1, Floor 6
15 Lake Street
Tuesday
26 August
Townsville
Holiday Inn
334 Flinders Street
Wednesday
27 August
Mackay
Quest Mackay
38 Macalister Street
Thursday
28 August
Bundaberg
Dept of Transport & Main Roads
Riverside Conference Centre
Floor 1, 23 Quay Street
Friday
29 August
Rockhampton
Dept of Transport & Main Roads
Large Conference Room
Floor 1, 31 Knight Street
Wednesday
3 September
Brisbane
AAPA
11 Hi-Tech Court, Eight Mile Plains
Tuesday
16 September
Nerang
Hinterland Hotel
55 Station Road
Wednesday
17 September
Brisbane
Dept of Transport & Main Roads
Room 6.08-09, 313 Adelaide Street
Thursday
18 September
Toowoomba
Dept of Transport & Main Roads
1-5 Phillip Street
Monday
22 September
Deagon
Dept of Transport & Main Roads
7 Depot Rd, Deagon
Tuesday
23 September
Maroochydore
Dept of Transport & Main Roads
12 First Avenue
VENUES
PURPOSE
These Awareness Sessions were held to inform and consult with
stakeholders, in industry and the regions, about the upcoming changes
to the Transport and Main Roads specification for "heavy duty" dense
graded asphalt (PSS/PSTS31).  The specification has been harmonised
with that of New South Wales allowing this type of asphalt to be delivered
under very similar conditions in both states.

The new specification covers applications of the current MRTS30 & MRTS31
are used, meaning the new specification will be used for the majority of TMR
and some local government asphalt works.

The awareness sessions provided details of the changed framework for
asphalt mix design, manufacture, construction and performance
expectations.  The new specification expects a changed relationship
between the asphalt supplier and client, with increased responsibilities
placed on the asphalt contractor and a collaborative relationship required
in the delivery of the contract.
Specifically covered in the awareness sessions were:

  • Technical and testing changes between old & new specifications

  • Proposed Prequalification system – moving from the current Asphalt
    Supplier Registration to a Prequalification system based on the national
    prequalification system for road and bridge construction contractors.

  • Warranty & performance – 12 month shape deformation requirements
    and a 24 month warranty on asphalt performance

  • Training will be required for all users of the new specification through a
    new AAPA course derived (based on the RMS training package).

  • Implementation – projects suitable to demonstrate the specification,
    ideally in all the TMR Regions

  • Time frame - Demonstration projects from 30 June 2014 and full
    switchover in July 2015
No.
Title
Date
HERE
1.
PSTS30 Asphalt Pavements
[Project Specific Technical Specification]
Jan '15
2.
PSTS30.1 Annexure Asphalt Pavements
Jan '15
3.
PSS30 Asphalt Pavements
[Project Specific Specification (Measurement)]
Jan '15
4.
PSTS108 Aggregates for Asphalt
[Project Specific Technical Specification]
Jan '15
5.
PSTS108.1 Aggregates for Asphalt
[Project Specific Technical Specification - Annexure]
Jan '15
6.
PSTS109 Reclaimed Asphalt Pavement Material
[Project Specific Technical Specification]
Aug'14
7.
PSTS109.1 Reclaimed Asphalt Pavement Material
[Project Specific Technical Specification - Annexure]
Aug'14
8.
PSTS110 Fillers for Asphalt
[Project Specific Technical Specification]
Aug'14
9.
PSTS110.1 Fillers for Asphalt
[Project Specific Technical Specification - Annexure]
Aug'14
10.
PROGRAM FOR THE DAY
 
11.
     
12.
     
REFERENCE MATERIAL
This reference material should be downloaded and brought to the
awareness sessions for consideration and review. Material will be added
including updates, awareness sessions presentations and questions submitted.
NEWS & UPDATES
No.
Title
Size/Date
PDF
PDFx6
1.
00 Introduction
20140826
2.
01 Welcome
20140826
3.
02 Harmonisation (TMR)
20140826
4.
03A Advantages - why change (AAPA)
20140826
5.
03B Advantages - why change (TMR)
20140826
6.
04A Warranty-prequal-reg-roles (AAPA)
20140826
7.
04B Warranty-prequal-reg-roles (TMR)
20140826
8.
05 Management Issues
20140826
9.
06A Introducing the new specification (AAPA)
20140826
10.
06B Introducing the new specification (TMR)
20140826
11.
07A Implementation - Demonstration (AAPA)
20140826
12.
07B Implementation - Demo (TMR)
20140826
13.
08 Discussion and feedback panel
20140826
14.
09 Close
20140826
15.
10 Training course NEW
20140924
 
       
PRESENTATIONS AT AWARENESS SESSIONS
Brochure for the Awareness Sessions