Events
New Asphalt Harmonised
Awareness Sessions
Event organisers
Date
|
Centre
|
Address
|
|
|
Dept of Transport & Main Roads Room 6.1, Floor 6 15 Lake Street
|
|
|
Holiday Inn 334 Flinders Street
|
|
|
Quest Mackay 38 Macalister Street
|
|
|
Dept of Transport & Main Roads Riverside Conference Centre Floor 1, 23 Quay Street
|
|
|
Dept of Transport & Main Roads Large Conference Room Floor 1, 31 Knight Street
|
|
|
AAPA 11 Hi-Tech Court, Eight Mile Plains
|
|
|
Hinterland Hotel 55 Station Road
|
|
|
Dept of Transport & Main Roads Room 6.08-09, 313 Adelaide Street
|
|
|
|
Dept of Transport & Main Roads 1-5 Phillip Street
|
|
Monday 22 September
|
Deagon
|
Dept of Transport & Main Roads 7 Depot Rd, Deagon
|
|
|
Dept of Transport & Main Roads 12 First Avenue
|
|
VENUES
PURPOSE
These Awareness Sessions were held to inform and consult with
stakeholders, in industry and the regions, about the upcoming changes
to the Transport and Main Roads specification for "heavy duty" dense
graded asphalt (PSS/PSTS31). The specification has been harmonised
with that of New South Wales allowing this type of asphalt to be delivered
under very similar conditions in both states.
The new specification covers applications of the current MRTS30 & MRTS31
are used, meaning the new specification will be used for the majority of TMR
and some local government asphalt works.
The awareness sessions provided details of the changed framework for
asphalt mix design, manufacture, construction and performance
expectations. The new specification expects a changed relationship
between the asphalt supplier and client, with increased responsibilities
placed on the asphalt contractor and a collaborative relationship required
in the delivery of the contract.
Specifically covered in the awareness sessions were:
- Technical and testing changes between old & new specifications
- Proposed Prequalification system – moving from the current Asphalt
Supplier Registration to a Prequalification system based on the national
prequalification system for road and bridge construction contractors.
- Warranty & performance – 12 month shape deformation requirements
and a 24 month warranty on asphalt performance
- Training will be required for all users of the new specification through a
new AAPA course derived (based on the RMS training package).
- Implementation – projects suitable to demonstrate the specification,
ideally in all the TMR Regions
- Time frame - Demonstration projects from 30 June 2014 and full
switchover in July 2015
No.
|
Title
|
Date
|
HERE
|
|
PSTS30 Asphalt Pavements [Project Specific Technical Specification]
|
|
|
|
|
PSTS30.1 Annexure Asphalt Pavements
|
|
|
|
|
PSS30 Asphalt Pavements [Project Specific Specification (Measurement)]
|
|
|
|
|
PSTS108 Aggregates for Asphalt [Project Specific Technical Specification]
|
|
|
|
|
PSTS108.1 Aggregates for Asphalt [Project Specific Technical Specification - Annexure]
|
|
|
|
PSTS109 Reclaimed Asphalt Pavement Material [Project Specific Technical Specification]
|
|
|
|
|
PSTS109.1 Reclaimed Asphalt Pavement Material [Project Specific Technical Specification - Annexure]
|
|
|
|
PSTS110 Fillers for Asphalt [Project Specific Technical Specification]
|
|
|
|
PSTS110.1 Fillers for Asphalt [Project Specific Technical Specification - Annexure]
|
|
|
|
PROGRAM FOR THE DAY
|
|
|
|
|
|
|
|
|
|
|
|
REFERENCE MATERIAL
This reference material should be downloaded and brought to the
awareness sessions for consideration and review. Material will be added
including updates, awareness sessions presentations and questions submitted.
NEWS & UPDATES
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
03A Advantages - why change (AAPA)
|
|
|
|
|
|
03B Advantages - why change (TMR)
|
|
|
|
|
|
04A Warranty-prequal-reg-roles (AAPA)
|
|
|
|
|
|
04B Warranty-prequal-reg-roles (TMR)
|
|
|
|
|
|
|
|
|
|
|
06A Introducing the new specification (AAPA)
|
|
|
|
|
|
06B Introducing the new specification (TMR)
|
|
|
|
|
|
07A Implementation - Demonstration (AAPA)
|
|
|
|
|
|
07B Implementation - Demo (TMR)
|
|
|
|
|
|
08 Discussion and feedback panel
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PRESENTATIONS AT AWARENESS SESSIONS
Brochure for the Awareness Sessions